124 Permit Decision Notice for Redwater Confluence Boat Ramp Project

Jan 29, 2025 12:41 PM

A Decision Notice has been issued for a 124 Permit issued for the installation of a gravel aggregate boat ramp on the Missouri River near the Redwater Confluence.

The overall project consists of developing a new fishing access site including a gravel access road, cattle guards, fencing, drainage culverts, parking area, vault latrine, and a gravel aggregate boat ramp. Installation of the boat ramp is the only activities of the proposed project requiring a SPA 124 Permit.  Construction of the boat ramp includes minor excavation of the riverbank and some streambed to create the correct slope and room to install underlayment materials consisting of a geotextile fabric, 6 inches of 2.5 inch minus road ballast, and topped with 4 inches of ¾ inch minus gravel aggregate.  The boat ramp will be 16 feet wide by 73 feet long by 10 inches thick and extend 25 feet into the water with 2 feet of water over the end of the boat ramp (as measured during normal base river flows).  The proposed action of this decision notice is issuing an SPA 124 Permit for construction of the gravel aggregate boat ramp.

With this action, FWP hereby adopts the Draft Environmental Assessment or Draft EA prepared for the proposed action as final, and approves Alternative 2, the proposed action. 

Related Documents:

124 Permit Decision Notice for Redwater Confluence Boat Ramp Project
SPA124 Permit