The City of Conrad proposed installing a new stormwater collection system with direct pipe outfall into Pondera Coulee. The goal is to address localized flooding and sewer system infiltration by redirecting stormwater into a piped collection system and eventually into Pondera Coulee. There will be two direct pipe locations into Pondera Coulee: Blazen Rd and Interstate 15. They plan to riprap the streambank around the concrete structure to reduce erosion potential.
Based on the environmental review provided in the Draft EA, and, to the greatest extent possible, in accordance with all applicable laws, rules, regulations, and policies, FWP determined the proposed action (Alternative 2), will not have significant adverse impacts on the human environment associated with the proposed action and constitutes a reasonable and appropriate strategy to achieve identified objectives. Therefore, preparation of an environmental impact statement or EIS is unnecessary.
FWP hereby adopts the Draft EA as final and approves Alternative 2, the Proposed Action.
Related Documents
Conrad Stormwater Project SPA 124 Permit Decision Notice FWP-CEA-FSH-R4-24-042 (PDF)