Unnamed Tributary to Standard Creek Culvert Replacements FWP-FSH-DN-R3-24-075
Nov 19, 2024 2:56 PM
Two culvert replacements are proposed on the Standard Creek Road #237. Both locations had water present when inventoried in September. The existing banks at the sites are vegetated with grass/sedge, forbs, and willows. These culverts are beginning to rust to the point of deterioration. Banks are generally in good condition. There are no nearby structures present or wetlands at these locations. MP 15.72 - replace existing 18" culvert with 24" x 24' CMP (unnamed tributary to Standard Creek. MP 16.66 - replace existing 18" culvert with 24" CMP x 34' CMP (unnamed tributary to Standard Creek)
The applicant is Dale Olson of the United States Forest Service. The project is expected to occur over 3 days in late October – Early November.