Henneberry FAS Improvement FWP-DN-FSH-R3-24-032
May 10, 2024 4:06 PM
The project will improve two existing boat ramps and repair an eroding stream bank by installing a brush matrix at Henneberry FAS. The new boat ramps will replace existing eroding, dirt ramps that receive high use. The streambank repairs will reduce sediment input into the Beaverhead River, improve riparian vegetation, and stabilize the streambanks upstream of the boat ramps.
Related Documents