Sixmile Creek Concrete Ford at Milepost 4.36 FWP-DN-FSH-R3-24-057
Aug 2, 2024 3:23 PM
The purpose of the project is to stabilize the existing ford, lower sediment inputs into the creek, and increase stability/safety for users. The project involves placement of a 12’x 25’ articulated concrete mat underlaid by an aggregate base and Class 3 riprap.
The proposed dates for work are 7/1/2024 to 10/30/2025.