

An EA originally was prepared for this project in 2005 when it called for returning the channelized stream to its historic location to the south of an existing ranch road, which acts as a floodplain berm. A design change recently was made calling for the new channel to be constructed to the north of both the ranch road and the existing channelized reach of stream. This EA addresses the proposed changes in design.
Mark Lere FWP 1420 East 6th Avenue Helena, MT 59620 (406) 444-2432
The public comment period for this public notice ended on Monday, March 23, 2009.