It is my decision to proceed with the preferred alternative by improving the condition of the by-pass road in Bannack State Park through reshaping, widening, fixing drainage issues, removing vegetation, and adding a shoulder in areas. Enlarging the existing overflow lot and adding a bus pullout would also expand event parking. As part of the same project, various erosion control measures would be implemented on an eroding hillside underneath a historic water flume, and barbs installed in Grasshopper Creek with no changes to the Environmental Assessment (EA). (Annual Rules - 06/01/2007)
It is my decision to proceed with the preferred alternative by improving the condition of the by-pass road in Bannack State Park through reshaping, widening, fixing drainage issues, removing vegetation, and adding a shoulder in areas. Enlarging the existing overflow lot and adding a bus pullout would also expand event parking. As part of the same project, various erosion control measures would be implemented on an eroding hillside underneath a historic water flume, and barbs installed in Grasshopper Creek with no changes to the Environmental Assessment (EA). (Decision Notices - 06/01/2007)